top of page
Millside at HEritage Park Canton.jpg

Millside at Heritage Park, Canton, MA

  • Location: Neponset St, Canton, MA

  • Building Description: 60 units

  • Open Date: July 2021

 

Currently under construction, this 60 unit, 55-and-older apartment complex is located in the heart of the redevelopment of the former Paul Revere Copper Factory located directly off of Neponset St that will eventually have 272 units of residential living along with commercial amenities. The project is located in close proximity to walking trails, public parks and a riverwalk adjacent to the Neponset River. Canton Junction and Canton Center are located within easy walking distance providing commuter access to Boston and Providence. Residents will have access to a clubhouse and pool and the restored Historic Paul Revere Foundry building will provide dining excellence.

120 Emblem Woburn.jpg

Emblem 120

Woburn, MA

 

Client

Toll Brothers

 

Architect

CUBE 3

 

At a glance

  • 6-story, wrapped & podium construction

  • 289 units

  • 470,115 SF

  • Amenities courtyard

NYC DOitt.png

NYCDOITT/FDNY/NYPD

Bronx, NY

 

Access Control

PDC IDenticard-PremiSys/Rack Armor

 

Video Surveillance

MiraSys

 

At a glance

  • Data Center Racks Secured with PremiSys Rack Armor Pro

  • Pinhole Cameras- Axis Communications

  • Power Supplies -Life safety Power

Ava Assembly.jpg

Avalon Bay Properties

Multiple Locations MA

  1. Prudential Towers (3 Towers)

  2. Assembly Row

 

Access Control

Latch Systems

LifeSafety Power

 

Wiring

Paige Datacom

The FOundry.jpg

The Foundry-Promenaude & Sharp

Providence RI

 

Access Control

Latch Systems

LifeSafety Power

 

Wiring

Paige Datacom

Wrentham Town HAll.jpg

Wrentham Town Hall

Wrentham MA

 

Access Control

PDC IDenticard

LifeSafety Power

 

Wiring

Paige Datacom

bottom of page